Page 35 - 6. Diktat Kimia AIr
P. 35
BAB VI
DAFTAR PUSTAKA
1. I AEA-Engineering. “Structural Design Calculation Volume 1, 2 & 3, Transfer
Channel and ISFSF for BATAN”, AEA Engineering, 1993
2. AEA Engineering, “Preliminary Design Package, Volume 1 & 2, Transfer
Channel and ISFSF for BATAN”, AEA Engineering, 1993
3. AEA Engineering, “Feasibility Study, Geology and Foundation Conditions, Final
Response for ISFSF”, December 1982
4. AEA Engineering, “Transfer Channel and ISFSF for BATAN, Preliminary Design
Package Vol. 1”, AEA Technology, November 1992AEA, Proceeding of a Technical
Meeting : ”Management and Storage of Research Reactor Spent Nuclear Fuel”,
United Kingdom, 19-22 October 2009
5. IAEA, ”Corrosion of Research Reactor Aluminium Clad Spent Fuel in Water”,
TECDOC-1637
6. IAEA, ”Spent Fuel Storage Operation-Lesson Learned”, IAEA Tecdoc No. 1725
7. IAEA, ”Good Practices for Water Quality Management in Research Reactors
and Spent Fuel Storage Facilities”, Nuclear Energy Series N. NP.T-5-2, 2011
8. Pungky AA, Mirawaty, Kuat Heriyanto, “Analisis Subkritikalitas Bahan Bakar
Nuklir Bekas RSG GAS Menggunakan Aluminium”, Jurnal URANIA, PTBBN, 2017
9. L.K. Pudjiastuti, “Evaluasi Keselamatan Radiasi di Kanal Hubung Instalasi
Penyimpanan Sementara Bahan Bakar Nuklir Bekas (KH-IPSB3) Pasca Pengisian
Bahan Bakar Nuklir Bekas Reaktor Serba Guna-GA. Siwabessy”, Hasil penelitian dan
Kegiatan, ISSN 0852-2979, PTLR-BATAN, 2010
10. Dyah S. Rahayu, “Optimasi dan Revisi Kanal Hubung-Instalasi Penyimpanan
Sementara”, Prosiding Semnas Teknologi Pengelolaan Limbah VII, 2012
11. Djunaidi, Sapto Prayogo, “Tinjauan Pembangunan Fasilitas Penyimpanan Bahan
Bakar Bekas RSG-GAS dari Aspek Keselamatan”, Prosiding Seminar Teknologi
Pendayagunaan Reaktor Riset GA. Siwabessy, 2000
12. Dyah S. Rahayu, dkk. “Pengkajian Analisa Kualitas Air Kolam dan Kanal Hubung
Instalasi Penyimpanan Sementara Bahan Bakar Bekas (IPSB3)”, Prosiding Semnas
Teknologi Pengelolaan Limbah V, 2010
13. .PRSG-BATAN, “Safety Analysis Report Rev. 8, Multipurpose Reactor GA.
Siwabessy”, March 1999.
14. AEA Engineering, UK, “Preliminary Design TC-ISFSF, Volume 1 & 2 “ Electrical
Supply, Lighting, Alarms, Control and Instrumentation”, 1992.
15. PT. Waskita Karya, “ Deskripsi Sistem Pemantau Radiasi TC-ISFSF”, 1998.
16. PT. Waskita Karya, “ Sistem Alarm Terpusat TC-ISFSF””, 1998.
17. AEA Engineering , “Pond Cooling Requirement/Heat Output From Fuel, Design
Note of Transfer Channel And ISFSF For BATAN”, Document No.
JDP/BAT/DN04, 1992.
18. AEA Engineering, “Design Note of Transfer Channel And ISFSF For BATAN”,
34
Kimia Air, DPK-BRIN, 2024